EPC Group (founded 1997, Houston; all six Microsoft Solutions Partner designations) advises on Dynamics 365 partner selection and integration with Microsoft 365 and Power Platform. Ask every implementation partner six things: how its method maps to Microsoft's Success by Design reviews, how scope maps to apps and licenses, how data is migrated and reconciled, how SharePoint, Teams and Power BI connect, which rollout model it proposes, and who measures adoption.

Key Facts

  • Success by Design has two mandatory reviews: the Solution Blueprint Review and the Go live Readiness Review (Microsoft Learn, page dated 2026-08-04).
  • Implementation Reviews cover the data model, security, integration, ALM and testing strategy.
  • Big bang releases are not ideal for cloud implementations, which update every few weeks or months.
  • Server-based SharePoint integration stores documents in SharePoint in the context of a Dynamics 365 record.

Last updated by Errin O'Connor, Founder & Chief AI Architect, EPC Group

1. Ask how the partner's method maps to Success by Design

Microsoft publishes its own reference method. The Dynamics 365 implementation guide "helps you plan and run solutions that include Dynamics 365 apps and services" and follows Success by Design; its overview lists five stages, Strategize, Initiate, Implement, Prepare and Operate, and says it represents the knowledge of the FastTrack for Dynamics 365 team. Source: What is the Dynamics 365 implementation guide? (Microsoft Learn, page dated 2026-08-19, read 2026-11-25).

The Success by Design page names the first phase Discover and attaches reviews to the phases. The Solution Blueprint Review begins in Discover and should be mandatory; its findings lead to Implementation Reviews on the data model, security, integration, ALM and testing strategy; and the Go live Readiness Review, also mandatory, is "the last stop for assessing any remaining risks before go live." By the Prepare phase the cutover plan with go/no-go criteria, mock go-lives, the support model and the deployment runbook should exist. Microsoft also says Success by Design "doesn't guarantee implementation outcomes." Source: Introduction to the Success by Design framework (Microsoft Learn, page dated 2026-08-04, read 2026-11-25).

Ask: how does your methodology map to those phases; which deliverable comes out of each review; who leads the Solution Blueprint Review; and which findings would stop go-live?

2. Ask how scope maps to apps and licenses

Ask for scope written as business processes, each mapped to a named Dynamics 365 app, and each user group mapped to a license type. Then check the mapping against Microsoft's current licensing guide yourself. A partner that quotes a feature list instead of processes is quoting a demo.

3. Ask how data is migrated and reconciled

Ask which entities move from which source system, which tool moves them, how many mock migrations are planned, how record counts and key field values are reconciled after each run, and which business owner signs off the final load.

4. Ask how Dynamics 365 connects to SharePoint, Teams and Power BI

For documents, Microsoft describes server-based SharePoint integration: documents are stored and managed in SharePoint in the context of a record, users who are not running the app can still open them with the right permissions, users sign in once, no other software is installed on SharePoint, and SharePoint actions appear on the command bar. Source: Benefits of document management with SharePoint integration (Microsoft Learn, read 2026-11-25). Ask which site collection holds the documents, who governs its permissions, and how Teams and Power BI reports are connected to records.

5. Ask which rollout model the partner proposes

Microsoft describes three. In a big bang, all users start on the new system on one date; Microsoft says big bang releases "aren't ideal for cloud implementations, as the cloud service updates regularly (every few weeks or months)." A phased rollout releases by module, business priority, business unit or geography, lowers business risk and needs temporary interfaces until all phases are live. A parallel rollout keeps the old system running, so users enter information twice. Source: Plan your solution deployment and release (Microsoft Learn, read 2026-11-25). Ask what the first release contains, which interfaces are temporary, and when the old system is switched off.

6. Ask who measures adoption after go-live

Success by Design tracks project health across seven categories and over 30 success measures, each updated red, yellow or green after a review, and treats the Operate phase as stabilization before the next phase. Ask the partner which measures it will report, how often, and which person on your side owns each one after hypercare ends.

How EPC Group helps

EPC Group advises on Dynamics 365 partner selection and on how Dynamics 365 fits an existing Microsoft 365 tenant, SharePoint document management, Teams and Power BI. Its Solutions Partner designations are on its Microsoft partner listing. See Dynamics 365 consulting, and for the integration layer, Power Platform consulting.

Next step

Request a free consultation. Send an inquiry and EPC Group replies to arrange a call. Bring the proposals you hold; you receive them compared against these six sets of questions.

Dynamics 365 Implementation Partner FAQ

Which Dynamics 365 apps are in scope, and how are they licensed?

Ask the partner to write scope as business processes mapped to named apps, such as Dynamics 365 Sales, Customer Service, Field Service or Finance, and to map each user group to a license type. Then check that mapping against Microsoft's current Dynamics 365 licensing guide yourself before you sign; licensing is Microsoft's to state, not the partner's.

How is data migrated and validated?

Ask for the migration plan in writing: which entities move from which source, the tool, the number of mock migrations, how record counts and key field values are reconciled after each run, and which business owner signs off. A partner that cannot name the reconciliation checks before the project starts has not planned them.

How does Dynamics 365 integrate with SharePoint, Teams and Power BI?

For documents, Microsoft Learn describes server-based SharePoint integration: documents are stored in SharePoint in the context of a record, users sign in once, no other software is installed on SharePoint, documents display in lists and SharePoint actions sit on the command bar (Benefits of document management with SharePoint integration, read 2026-11-25). Ask how the partner configures it and how Teams and Power BI connect.

What does a phased rollout look like?

Microsoft Learn describes phases planned by module, business priority, business unit or geography, with temporary interfaces to old systems until all phases are live, lower business risk and lessons carried into later phases. It says big bang releases are not ideal for cloud implementations because the service updates every few weeks or months (Plan your solution deployment and release, read 2026-11-25).

How is adoption measured?

Ask which measures the partner will track and who owns each after go-live. Microsoft's Success by Design tracks project health across seven categories and over 30 success measures, updated red, yellow or green after each review, and places stabilization in the Operate phase. EPC Group asks for the named internal owner of each measure before the contract is signed.