Skip to main content

Anonymized engagement summary: data warehouse validation, row- and column-level security for partner clinics, and 15–20 Power BI reports for a healthcare services company (2025)

Anonymized engagement summaryHealthcare services company working with partner clinics · 2025

Opening answer. In 2025 EPC Group was engaged by a healthcare services company that works with partner clinics. The company is building a data warehouse that brings together its CRM, a proprietary equipment-monitoring application and its telephony data. EPC Group's role:

  • validate the warehouse architecture
  • audit and optimize the security model at object, row and column level for partner clinics and internal users
  • support the complex integration and pipeline work
  • design and deliver 15–20 priority Power BI reports, including a partner revenue-share template and monitoring dashboards with event-driven alerts

All reporting is to work the same across browsers, desktops, tablets and mobile devices.

This is an anonymized engagement summary published under EPC Group's anonymized-engagement rule: the client is not named, no commercial terms are published, and every statement is EPC-reported. Named, documented engagements are in the Evidence Center.

Problem and scope

ItemScope
OrganizationA healthcare services company working with partner clinics
SituationGrowth, closer collaboration with partners and a need for better operational insight, met by a data warehouse integrating the CRM, an equipment-monitoring application and telephony
ObjectiveSecure, device-agnostic Power BI reporting for internal leadership and external partners, built on a validated warehouse
Data warehouse advisoryArchitecture review and gap analysis, including data-structure design for interoperability; audit and optimization of object-, row- and column-level permissions for partner clinics and internal users; support for complex integration including cross-database queries and performance tuning; troubleshooting of pipelines and ETL
Power BI development15–20 high-priority reports: partner revenue-share reports built as a reusable template for multiple partners, monitoring dashboards with event-driven alerts, and operational and CRM analytics, with device-agnostic layouts and drill-down
Documentation and governanceA data-warehouse security configuration matrix, source-to-report lineage mapping, a troubleshooting guide for common ETL issues, report development standards and semantic-model version control procedures
EnablementHybrid training for end users, administrators and report developers; knowledge-transfer workshops on warehouse management and Power BI practice; an advisory report on future phases

Not reported: data volumes, the number of partners and users, which reports were delivered, and any measured result.

Approach and artifacts

Security is audited where partners see data. Partner clinics and internal users read the same warehouse, so the security model is audited at object, row and column level. The resulting configuration matrix is written down as a deliverable, not left in the database.

One revenue-share template, many partners. Partner revenue-share reporting is specified as a scalable template for multiple partners.

Acceptance criteria with numbers in them. Reports pass user-acceptance testing with no more than two critical defects. Documentation is reviewed and approved by the client's IT leadership within five business days of delivery. Deliverables are reviewed within fifteen business days.

Risks named with their controls. Three risks are paired with controls:

  • delayed access to source systems: weekly access-readiness checkpoints from day one
  • evolving report requirements: prototype reviews every fourteen days with stakeholder sign-off
  • knowledge gaps in the internal team: the training and workshops above

Phased delivery. The phases run in order:

1. architecture validation 2. security-model audit, integration optimization and pipeline tuning 3. report development with advisory support and documentation 4. user-acceptance testing, device optimization, training and final revisions

A prioritized list of the 15–20 reports is due from the company within five business days of signing. Telephony integration later in the year stays with the company's team, with EPC Group advising.

What EPC Group delivered and what is not claimed

ClaimBasisStatus
The company contracted EPC Group for warehouse validation, a security-model audit and 15–20 Power BI reportsEPC engagement recordContracted (EPC-reported)
Reports delivered, UAT passed, documentation approved, or measured resultsNot reportedNot claimed

Related services

Power BI consulting · Microsoft Fabric consulting · All case studies · Talk to a senior architect

Last updated by Errin O'Connor, Founder & Chief AI Architect, EPC Group

Related service: Power BI Enterprise Security for Sensitive Data

Author: Errin O'Connor, Founder & Chief AI Architect, EPC Group · Published October 25, 2026 · Project alias EPC-2025-ANON-HCSVC-DWPBI · Published under the anonymized-engagement rule.

AI assistant — not a human