Anonymized engagement summary: an SAP upgrade and conversion of about 30 SAP reports to Power BI on a 90-day timeline, for a global aerospace manufacturer (2021)

Anonymized engagement summaryGlobal aerospace manufacturer · 2021

Opening answer. In 2021 EPC Group was engaged by a global aerospace manufacturer to upgrade its internal SAP version and then move its SAP reports into Microsoft Power BI. About 30 reports were in scope at the outset, possibly more. The work had a 90-day timeline. EPC Group ran SAP and Power BI teams in parallel, in coordination, and delivered train-the-trainer knowledge transfer alongside. The scope was set after deep-dive sessions with the client and testing against the data it provided.

This is an anonymized engagement summary published under EPC Group's anonymized-engagement rule: the client is not named, no commercial terms are published, and every statement is EPC-reported. Named, documented engagements are in the Evidence Center.

Problem and scope

ItemScope
OrganizationA global aerospace manufacturer
SituationReports built on an internal SAP version that needed upgrading, to be rebuilt in Power BI
Report scopeAbout 30 reports, with more possibly added
Timeline90 days
Delivery modelSAP development and upgrade work and Power BI development, implementation and testing run in parallel by coordinated SAP and Power BI teams
EnablementTrain-the-trainer sessions and knowledge transfer working side by side with the manufacturer's technical staff
BasisScope set after deep-dive sessions with the client and testing of all the data it provided

Not reported: which SAP modules were involved, the final report count, user counts and any measured result.

Approach and artifacts

Two teams, one deadline. The SAP upgrade and the Power BI rebuild depend on each other, so the engagement runs them in parallel to meet the 90-day timeline.

Scope from real data. Before committing to the timeline, EPC Group ran deep-dive sessions and tested against the client's actual data.

Leave the knowledge behind. Train-the-trainer sessions run during delivery.

What EPC Group delivered and what is not claimed

ClaimBasisStatus
The manufacturer contracted EPC Group for an SAP upgrade and conversion of about 30 reports to Power BI in 90 daysEPC engagement recordContracted (EPC-reported)
Reports converted on time, accepted, or measured resultsNot reportedNot claimed

Related services

Power BI consulting · All case studies · Talk to a senior architect

Last updated by Errin O'Connor, Founder & Chief AI Architect, EPC Group

Related service: Enterprise Azure Analytics Platform

Author: Errin O'Connor, Founder & Chief AI Architect, EPC Group · Published October 25, 2026 · Project alias EPC-2021-ANON-AERO-SAPPBI · Published under the anonymized-engagement rule.