What the protocol measures
A Fabric workload benchmark protocol measures how many capacity unit (CU) seconds your own operations consume, how Fabric smooths that use over time, and whether a given F SKU would throttle under your real concurrency. It fixes the workloads, the capacity, the run plan and the way results are read, so a result can be repeated and compared.
EPC Group runs this protocol before recommending a capacity size as part of its Microsoft Fabric consulting work. This page publishes the protocol only; it carries no benchmark results.
How Fabric counts capacity (what you are measuring)
- Timepoints: Fabric accounts for CU use in 30-second timepoints; the next 24 hours contain 2,880 of them.
- Bursting and smoothing: an operation may use more compute than the SKU provides, and Fabric then spreads its CU use over future timepoints: at least five and up to 64 minutes for interactive operations, 24 hours for background operations.
- Overage protection: a capacity can use 10 minutes of future capacity without throttling.
- Throttling stages: from 10 to 60 minutes of future use, new interactive jobs are delayed by 20 seconds; from 60 minutes to 24 hours they are rejected; beyond 24 hours, all new requests are rejected. In-flight operations are not throttled.
- Carryforward and burndown: overages beyond the 10-minute window carry forward; unused capacity in later timepoints burns them down.
The protocol, step by step
- Define the workloads. List each operation you will run (report views, semantic model refreshes, pipelines, notebooks, warehouse queries) and whether Fabric treats it as interactive or background. The classification decides how its CU use is smoothed.
- Fix the test capacity. Run on one F SKU that nothing else uses during the test, and record the SKU. Fabric applies throttling at the capacity level, so other workspaces on the same capacity would distort the result.
- Set the run plan. Write down the number of runs, the concurrency (how many users or jobs at once), the data volume and the time of each run before you start. Change one variable per run.
- Run and wait for the data. Run the plan, then wait before reading results: usage data in the Capacity Metrics app generally appears 10 to 15 minutes after the activity.
- Read CU seconds per operation. Use the Timepoint and Timepoint item detail pages to read CU seconds for each operation in the 30-second timepoints your run covered, split into interactive and background.
- Read throttling, not only utilization. Utilization above 100% does not by itself mean throttling. Use the Throttling chart and the Overages tab (10-minute, 60-minute and 24-hour views) to see whether the run crossed a throttling limit, and note minutes to burndown.
- Separate billable from non-billable. Throttling calculations include only billable operations. Record non-billable (preview) operations separately, because they will count once those features become billable.
- Record and repeat. Write each run into the results sheet, then repeat the run at least once to confirm the result is stable before you size a capacity on it.
Results sheet
One row per run. Leave nothing blank: an empty cell means the run is not comparable.
| Field | Record |
|---|---|
| Run ID, date and start time | So the run can be found in the Timepoint pages. |
| F SKU | The capacity size used for the run. |
| Workload and classification | The operation and whether it ran as interactive or background. |
| Concurrency and data volume | Users or jobs at once, and rows or GB processed. |
| CU seconds | Per operation, from the Timepoint item detail page. |
| Peak 10-minute and 60-minute throttling % | From the Throttling chart. |
| Delays, rejections, minutes to burndown | From the Overages tab and the System events table. |
| Non-billable CU seconds | Preview operations, recorded separately. |
When the results are in, size the SKU with the Fabric capacity calculator and price it with the F SKU cost model.
Frequently Asked Questions
What is a Fabric workload benchmark protocol?
It is a fixed procedure for measuring how much Microsoft Fabric capacity your own workloads use: which operations to run, on which F SKU, at what concurrency, and how to read CU seconds, smoothing and throttling in the Fabric Capacity Metrics app. A protocol makes results repeatable, so two runs or two vendors can be compared.
Why not just watch the utilization percentage?
Because Fabric smooths usage. Interactive operations are smoothed over at least five minutes and up to 64 minutes, and background operations over 24 hours, so a large job can show high utilization without being throttled. Microsoft says to use the Throttling chart when you evaluate overages.
When does Fabric start throttling?
After overage protection lets a capacity use 10 minutes of future capacity. Between 10 and 60 minutes, new interactive jobs are delayed by 20 seconds; between 60 minutes and 24 hours, new interactive jobs are rejected; beyond 24 hours, all new requests are rejected until the carryforward is paid off.
Does this page publish benchmark results?
No. This page is the protocol only. Results depend on your data, model design, concurrency and SKU, so they have to be measured on your workloads.
Which tool measures the results?
The Microsoft Fabric Capacity Metrics app. Its Compute page gives a 14-day view of capacity compute, and its Timepoint pages show which operations used the most CU in a given 30-second timepoint.
Sources: Understand capacity throttling and smoothing (Microsoft Learn, updated 2026-11-20, read 2026-11-24); What is the Microsoft Fabric Capacity Metrics app? (Microsoft Learn, updated 2026-11-20, read 2026-11-24).
Request a free consultation
Send an inquiry and EPC Group replies to arrange a call. Bring the workloads you plan to run on Fabric and the SKU you are considering. Request a free consultation.
