Definition
An implementation evidence dictionary is the set of agreed terms for recording what a technology implementation delivered and how each piece of proof can be checked. It separates what a document shows from what it does not, so a buyer, an auditor and a vendor read the same record the same way.
EPC Group uses this dictionary for every record in its Evidence Center and for the commitments in its EPC Group service standard. The definitions below are those record fields in plain words; they define evidence types only and carry no figures.
The dictionary
| Term | Definition | What it shows | What it does not show |
|---|---|---|---|
| Engagement fact | The engagement as the client’s own paper states it, such as a purchase-order line or an agreement recital. | That the client contracted the work described. | That the work was delivered or what it achieved. |
| Scope (client document or SOW-stated) | What the work covered, with its source marked: taken from a client document, or stated in the statement of work. | What was agreed to be done. | That every scoped item was completed. |
| Period | The start and end of the engagement as the documents date it; either end can be unknown. | When the work took place, where a document dates it. | Effort or staffing. |
| Claim level | The strongest statement the documents support, from Contracted through Delivered, Accepted, Outcome-verified, Client-endorsed and Work-product evidenced. It is derived from the documents, not chosen; only a new document can raise it. | How far the published paper goes. | Anything above the stated level. |
| Contracted (and its variants) | A contract or order exists. Variants mark a countersigned document, payment corroboration or a public procurement record. | A buying decision by the client. | Delivery or acceptance. |
| Delivered / Accepted | The work was completed, or the client accepted the deliverables, as a document records it. | Completion or sign-off. | A business outcome. |
| Outcome-verified | A result is stated in a document the client or a third party produced. | The stated outcome, on that document’s authority. | Outcomes the document does not state. |
| Client-endorsed | The client has said something about the work in its own words, on the record. | The client’s own view. | Facts beyond the endorsement. |
| Work-product evidenced | A redacted page of something the project produced, such as a design or a report, is published. | That the artifact exists. | That it was accepted or used. |
| Document record | Each source document listed with its type, issuer, the date it carries (or “undated”), the pages published, what it proves, what it does not prove, and its redactions. | Exactly which paper a claim rests on. | Pages that are not published. |
| SHA-256 hash | A fingerprint published beside every file, so a reader can confirm the file has not changed since it was published. | File integrity. | Who wrote the document or whether it is true. |
| Exhibit | A redacted page image of a document, with its own hash and a caption saying what it establishes and what was removed. | The page as published. | The removed text. |
| Transcript | Text read from a published page image, so the content can be searched and quoted. | The words on the published image. | Anything under a redaction. |
| OCR derivative | A searchable copy of the published redacted pages, with its own hash. It is never the signed original. | Searchable text of what was published. | The original file. |
| External record | A link to the same document on a public body’s site, with the date it was retrieved. | That a third party holds the document. | More than that document says. |
| Permission basis | Why the client may be named: a public record, a contract clause that permits it, written consent, an owner decision, or none. | The basis for naming the client. | An endorsement. |
| Tier | A label for the kind of client, not the strength of evidence: T1 government or public body, T2 regulated enterprise, T3 national or defense brand, T4 education. | The client’s sector type. | Evidence quality. |
| Does-not-claim list | A required list of the statements the record does not make, written conservatively. | The limits of the record. | — |
| Upgrade path | The document that would raise the record’s claim level if it were added. | What is missing. | — |
| Named senior architect | The senior architect named for each engagement under the EPC Group service standard, with a direct escalation line to the founder. | Who owns delivery. | Delivery itself. |
| Response window | How quickly EPC Group answers, set per engagement in the SOW for production-down incidents, client questions and proposal turnaround. | A written commitment for that engagement. | Performance against it. |
| Weekly written status | The written status report the service standard calls for on every project. | Progress as reported at the time. | Client acceptance. |
How to use it when you compare vendors
- Ask each bidder for one engagement like yours and the engagement fact behind it.
- Ask which claim level its paper supports, and see the documents: type, issuer, date and pages.
- Ask what those documents do not establish. A vendor that cannot answer has not checked.
- Check any hash you are given against the file you receive.
- Ask who the named senior architect is and where the response windows are written.
For the published records themselves, open the EPC Group Evidence Center; for how EPC-reported counts are kept, see the evidence methodology.
Frequently Asked Questions
What is an implementation evidence dictionary?
It is a list of the terms used to record what a technology implementation delivered and how each piece of proof can be checked. EPC Group’s dictionary defines the fields of its Evidence Center records, such as claim level, document record, SHA-256 hash and does-not-claim list, so buyers and auditors read every record the same way.
What is the difference between Contracted and Delivered?
Contracted means a contract or order exists. Delivered means a document records that the work was completed. Neither, on its own, says anything about a business outcome; that needs a document at the Outcome-verified level.
Why does every record list what it does not claim?
Because a reader should be able to see the limits of the evidence as clearly as the evidence itself. The list is required on every record and is written conservatively, so nothing is implied that the documents do not support.
How can I check a published document has not been altered?
Compute the SHA-256 hash of the file you download and compare it with the hash printed beside it on the record. If they match, the file is the one EPC Group published.
Can I ask a vendor for the same evidence?
Yes. Ask any bidder which of these items it can show for engagements like yours: the engagement fact, the scope and its source, the claim level, the documents behind it, and what those documents do not establish.
Sources: the field definitions of EPC Group’s Evidence Center records (Evidence Center, read 2026-11-24) and the EPC Group service standard (read 2026-11-24). No product facts are stated on this page.
Request a free consultation
Send an inquiry and EPC Group replies to arrange a call. Bring the evidence your shortlist has offered and the questions your procurement team needs answered. Request a free consultation.
Sources for the hash terms: NIST FIPS 180-4, Secure Hash Standard (defines SHA-256) · Get-FileHash (Microsoft Learn) (computes a file's SHA-256 hash so it can be checked against the record).
