EPC Group - Enterprise Microsoft AI, SharePoint, Power BI, and Azure Consulting
G2 High Performer Summer 2025, Momentum Leader Spring 2025, Leader Winter 2025, Leader Spring 2026
BlogContact
Ready to transform your Microsoft environment?Get started today
(888) 381-9725Get Free Consultation
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌
‌

EPC Group

Enterprise Microsoft consulting with 28+ years serving Fortune 500 companies.

(888) 381-9725
contact@epcgroup.net
4900 Woodway Drive - Suite 830
Houston, TX 77056

Follow Us

Solutions

  • All Services
  • Microsoft 365 Consulting
  • AI Governance
  • Azure AI Consulting
  • Cloud Migration
  • Microsoft Copilot
  • Data Governance
  • Microsoft Fabric
  • vCIO / vCAIO Services
  • Large-Scale Migrations
  • SharePoint Development

Industries

  • All Industries
  • Healthcare IT
  • Financial Services
  • Government
  • Education
  • Teams vs Slack

Power BI

  • Case Studies
  • 24/7 Emergency Support
  • Dashboard Guide
  • Gateway Setup
  • Premium Features
  • Lookup Functions
  • Power Pivot vs BI
  • Treemaps Guide
  • Dataverse
  • Power BI Consulting

Company

  • About Us
  • Our History
  • Microsoft Gold Partner
  • Case Studies
  • Testimonials
  • Blog
  • Resources
  • Contact

Microsoft Teams

  • Teams Questions
  • Teams Healthcare
  • Task Management
  • PSTN Calling
  • Enable Dial Pad

Azure & SharePoint

  • Azure Databricks
  • Azure DevOps
  • Azure Synapse
  • SharePoint MySites
  • SharePoint ECM
  • SharePoint vs M-Files

Comparisons

  • M365 vs Google
  • Databricks vs Dataproc
  • Dynamics vs SAP
  • Intune vs SCCM
  • Power BI vs MicroStrategy

Legal

  • Sitemap
  • Privacy Policy
  • Terms
  • Cookies

Our Specialized Practices

PowerBIConsulting.com|CopilotConsulting.com|SharePointSupport.com

© 2026 EPC Group. All rights reserved.

Microsoft 365 Migration Services - EPC Group enterprise consulting

Microsoft 365 Migration Services

Industry record holder. 625+ cloud migrations completed. Proprietary zero-downtime migration tool. 29 years of Microsoft expertise.

The Firm That Holds the Enterprise Migration Record

Who is the best Microsoft 365 migration partner? EPC Group holds the industry record for enterprise Microsoft 365 migrations with 625+ Google-to-M365 cloud migrations completed, a proprietary zero-downtime migration tool, and 29 years of Microsoft ecosystem expertise. Founded by 4x Microsoft Press bestselling author Errin O'Connor, EPC Group is one of the oldest Microsoft Gold Partners in North America. The firm specializes in tenant-to-tenant M&A migrations, Google Workspace to M365 conversions, and large-scale on-premises to cloud transitions for regulated industries including healthcare (HIPAA), financial services (SOC 2), and government (FedRAMP).

Microsoft 365 migration is not a commodity service. The difference between a migration partner who moves your email and one who transforms your organization's entire digital workplace is measured in downtime, data loss, compliance gaps, and the months of productivity disruption that follow a poorly executed migration. EPC Group has built its reputation on one principle: zero downtime, zero data loss, zero surprises.

Over 29 years, EPC Group has completed thousands of enterprise migrations across every scenario imaginable: tenant-to-tenant consolidations during billion-dollar mergers, Google Workspace to Microsoft 365 conversions for 20,000+ user organizations, on-premises Exchange and SharePoint Server migrations to the cloud, and emergency migrations with immovable regulatory deadlines. Our 625+ Google-to-M365 cloud migrations represent more completed conversions than any other Microsoft partner on record.

What sets EPC Group apart is our proprietary migration tool, developed over 15 years of continuous refinement. Unlike off-the-shelf products like ShareGate, BitTitan MigrationWiz, or native Microsoft migration tools, our platform delivers parallel batch processing at 50-100 GB per hour with built-in checksum validation, automatic retry logic, and compliance-grade audit logging. Combined with our 6-phase migration methodology and dedicated project teams, EPC Group consistently delivers migrations 40-60% faster than competitors while maintaining a perfect zero-data-loss record.

625+
Google-to-M365 Migrations
29
Years Microsoft Expertise
0
Data Loss Incidents
50+
M&A Migrations Per Year

Why EPC Group Holds the Migration Record

No other Microsoft partner matches our combination of experience, proprietary technology, and regulated industry expertise.

29 Years of Microsoft Expertise

EPC Group is one of the oldest Microsoft Gold Partners in North America. Founded by Errin O'Connor, a 4x Microsoft Press bestselling author whose books on SharePoint, Power BI, and Azure are used by enterprise architects worldwide. This depth of Microsoft ecosystem knowledge means we understand not just how to move data, but how to architect the target environment for optimal performance, security, and adoption.

Proprietary Zero-Downtime Tool

Our migration tool was built from the ground up over 15 years. It delivers 50-100 GB/hour throughput with parallel batch processing, checksum validation for every item, and automatic retry for throttled API calls. Unlike third-party tools that hit Microsoft API limits, our tool is optimized for sustained high-volume transfers. The result: migrations completed 40-60% faster with zero data loss.

625+ Cloud Migrations Completed

No other Microsoft partner has completed more Google Workspace to Microsoft 365 migrations. Each migration taught us something new about edge cases: Google Vault archives, shared drives with complex permissions, Google Groups to Microsoft 365 Groups conversion, and the dozens of gotchas that only surface at enterprise scale. This institutional knowledge is baked into our migration runbooks.

M&A Migration Specialists

Private equity firms and corporate development teams choose EPC Group because M&A timelines are immovable. When a deal closes on a specific date, the acquired company's employees need Day-1 access to corporate systems. We provide due diligence assessments, Day-1 readiness plans, and accelerated tenant consolidations that meet deal timelines every time.

Regulated Industry Focus

Healthcare, financial services, government, and education organizations cannot afford compliance gaps during migration. EPC Group maintains compliance continuity throughout the migration process with BAA-compliant handling for HIPAA, SOC 2 chain-of-custody documentation, FedRAMP-authorized procedures for government environments, and FERPA-compliant student data migration.

Dedicated Project Teams

Every migration gets a dedicated team: project manager, lead migration engineer, identity architect, SharePoint specialist, and 24/7 support during cutover windows. Our team members average 15+ years of Microsoft migration experience. You work with the same team from discovery through hypercare, not a revolving door of junior consultants.

Migration Services Portfolio

Every migration scenario. Every source platform. Every industry. One partner with the track record to prove it.

Tenant-to-Tenant (M&A)

Merge or split Microsoft 365 tenants during mergers, acquisitions, and divestitures. Day-1 IT integration with zero business disruption.

  • User mailbox migration
  • SharePoint site consolidation
  • Teams channels and chat history
  • Entra ID identity merge
  • Conditional Access policy alignment
  • Intune device re-enrollment

Google Workspace to M365

625+ completed migrations. Gmail, Drive, Calendar, Contacts, Sites, and Chat migrated with full metadata preservation.

  • Gmail to Outlook (labels, rules, folders)
  • Google Drive to OneDrive/SharePoint
  • Google Calendar to Outlook Calendar
  • Google Sites to SharePoint
  • Identity migration to Entra ID
  • DNS cutover and coexistence

Exchange to Microsoft 365

On-premises Exchange 2010-2019 to Exchange Online. Hybrid coexistence with staged mailbox moves and zero mail flow interruption.

  • Hybrid Exchange configuration
  • Staged mailbox migration
  • Public folder conversion
  • Archive and litigation hold migration
  • Distribution list migration
  • Server decommissioning

File Server to SharePoint

Network file shares and mapped drives to SharePoint Online and OneDrive. Permissions mapping and metadata preservation.

  • File share discovery and assessment
  • Folder structure optimization
  • Permissions mapping (NTFS to SharePoint)
  • Metadata and version history
  • Sync client deployment
  • User training and adoption

On-Premises to Cloud

Full on-premises infrastructure migration to Microsoft 365 cloud. Active Directory, Exchange, SharePoint, and file servers.

  • AD to Entra ID synchronization
  • Exchange hybrid to cloud-only
  • SharePoint Server to SharePoint Online
  • File servers to OneDrive/SharePoint
  • Print servers to Universal Print
  • Network infrastructure assessment

Cross-Tenant Consolidation

Organizations with multiple M365 tenants acquired over time. Consolidate into a single tenant for unified management.

  • Multi-tenant inventory and assessment
  • Domain consolidation planning
  • Phased tenant merging
  • License optimization
  • Policy and compliance alignment
  • Unified Global Address List

EPC Group's Proprietary Migration Tool

Developed over 15 years. Used in 2,000+ migrations. Zero data loss. The technology advantage that makes EPC Group the fastest and safest migration partner in the industry.

Zero Downtime

Continuous coexistence means users never experience a gap in service. Email flows, files sync, and calendars update throughout the entire migration.

50-100 GB/Hour

Parallel batch processing with optimized API utilization delivers sustained throughput that exceeds any third-party migration tool on the market.

Checksum Validation

Every item transferred is validated with checksum comparison. If a file, email, or calendar event does not match perfectly, it is automatically re-migrated.

Compliance Logging

Every action is logged with timestamps, user context, and data classification. Logs serve as audit evidence for HIPAA, SOC 2, FedRAMP, and internal compliance teams.

Auto-Retry Logic

Microsoft API throttling is handled automatically with exponential backoff. No failed items, no manual intervention, no data gaps from rate limiting.

Metadata Preservation

File timestamps, version history, sharing permissions, folder structures, and custom metadata are preserved exactly as they were in the source environment.

Real-Time Dashboard

Project managers and stakeholders monitor migration progress, error rates, and completion estimates through a live dashboard with email alerts.

Cross-Platform Support

Migrates from Google Workspace, Exchange on-premises, Lotus Notes, Novell GroupWise, Zimbra, and any IMAP-compatible email system to Microsoft 365.

Tool Comparison: EPC Group vs. Alternatives

CapabilityEPC Group ToolShareGateBitTitanNative Microsoft
Throughput (GB/hour)50-10010-2515-305-15
Zero-downtime coexistenceYesPartialYesLimited
Checksum validationEvery itemNoNoNo
Compliance audit loggingFullBasicBasicMinimal
Cross-platform (Google, Notes)YesSharePoint onlyYesLimited
Auto-retry with backoffYesYesYesManual
Real-time dashboardYesYesYesPowerShell logs
Metadata preservationFullPartialPartialPartial

EPC Group's 6-Phase Migration Methodology

Proven across 2,000+ migrations. Every phase has defined deliverables, exit criteria, and rollback procedures. No shortcuts, no surprises.

Phase 1

Discovery & Assessment

1-2 weeks
  • Complete source environment inventory (users, mailboxes, SharePoint sites, Teams, OneDrive)
  • Data volume analysis and migration speed estimation
  • Custom solutions and integrations catalog
  • Compliance requirements mapping (HIPAA, SOC 2, FedRAMP, FERPA)
  • Risk identification and mitigation planning
  • Success criteria definition and stakeholder alignment
  • Migration tool selection and licensing
Phase 2

Architecture & Planning

1-2 weeks
  • Target environment design (tenant configuration, domain setup)
  • Identity architecture (Entra ID structure, group strategy)
  • SharePoint information architecture (hub sites, taxonomy)
  • Migration runbook creation with step-by-step procedures
  • Communication plan for end users and stakeholders
  • Rollback plan and risk mitigation procedures
  • Testing and validation criteria per workload
Phase 3

Pilot Migration

1-2 weeks
  • Migrate 25-50 pilot users across representative departments
  • Validate all workloads: email, calendar, files, Teams, SharePoint
  • Test custom applications and integrations in target environment
  • Measure migration speed and refine batch scheduling
  • Collect user feedback and address issues
  • Validate compliance controls in target environment
  • Finalize migration runbook based on pilot results
Phase 4

Batch Migration

2-12 weeks
  • Execute migrations in planned batches (typically 200-500 users per batch)
  • Continuous monitoring via real-time migration dashboard
  • Nightly delta synchronization to capture changes
  • Batch validation with automated item count comparison
  • Issue escalation and resolution within SLA
  • Weekly status reporting to project stakeholders
  • Adjust batch sizes and scheduling based on performance data
Phase 5

Cutover & Validation

1 week
  • Final delta synchronization across all workloads
  • DNS MX record cutover (mail flow redirection)
  • Post-migration validation: item counts, permissions, access testing
  • User acceptance testing (UAT) with department leads
  • Verify compliance controls and audit logging
  • Disable source environment access (controlled)
  • Declare migration complete with stakeholder sign-off
Phase 6

Hypercare & Optimization

2-4 weeks
  • Dedicated support team for post-migration issues
  • 24/7 monitoring during first week post-cutover
  • End-user training sessions (Outlook, Teams, SharePoint, OneDrive)
  • Performance optimization and throttling adjustment
  • License cleanup and cost optimization
  • Source environment decommissioning plan
  • Final migration report with metrics and lessons learned

Migration Scenarios by Organization Size

Every organization is different. Here is what to expect based on your user count and data volume.

100 Users

2-3 weeks
50-200 GB From $15,000

Single-batch migration with weekend cutover. Email, files, and calendar migrated in one pass. Minimal coexistence period. Best for small businesses moving to M365 for the first time.

500 Users

4-6 weeks
500 GB - 2 TB $35,000 - $55,000

Two-batch migration: pilot group (50 users) followed by remaining users. Coexistence period for email routing. SharePoint site migration with permissions mapping. Department-level training.

1,000 Users

6-10 weeks
2-10 TB $55,000 - $85,000

Multi-batch migration across 3-4 waves. Full coexistence with mail flow rules. SharePoint information architecture redesign. Teams migration with channel mapping. Change management program.

5,000 Users

10-16 weeks
10-50 TB $120,000 - $250,000

Enterprise phased migration with dedicated project team. Complex identity architecture. Multi-region considerations. Custom application migration. Executive sponsorship and communication program. Compliance validation per phase.

10,000+ Users

16-24 weeks
50+ TB $250,000+

Full enterprise transformation. Multiple workstreams running in parallel. Regional migration waves across time zones. Custom migration tool deployment. 24/7 war room during cutover. Post-migration optimization and adoption program.

M&A Consolidation

6-20 weeks
Varies Custom scope

Deal-timeline-driven. Due diligence assessment during LOI phase. Day-1 readiness plan for closing. Accelerated tenant merge with identity federation. Compliance continuity documentation for regulators. Fixed-fee pricing for budget certainty.

Industry-Specific Migration Expertise

Regulated industries require more than data movement. They require compliance continuity, audit trails, and validated controls throughout the entire migration lifecycle.

Healthcare (HIPAA)

  • BAA execution with Microsoft and EPC Group before migration begins
  • PHI encryption in transit (TLS 1.2+) and at rest (AES-256)
  • Audit logging of every data movement operation
  • Access control validation in target environment
  • Post-migration HIPAA control assessment
  • Minimum necessary standard applied to data mapping

Financial Services (SOC 2)

  • SOC 2 Type II control continuity during migration
  • Chain-of-custody documentation for all data transfers
  • Encryption and access logging throughout migration
  • Change management documentation per SOC 2 CC8.1
  • Post-migration control validation and evidence collection
  • Regulatory notification support (if required by state regulations)

Government (FedRAMP)

  • Migration to GCC, GCC High, or DoD environments
  • FedRAMP-authorized migration tools and procedures
  • Personnel with appropriate security clearances
  • FIPS 140-2 validated encryption for data in transit
  • Continuous monitoring integration post-migration
  • Authority to Operate (ATO) boundary documentation

Education (FERPA)

  • Student data classified and migrated with FERPA-compliant handling
  • Parental consent verification for data transfer (where required)
  • Access controls separating student records from general data
  • Faculty and staff data migrated separately from student records
  • Microsoft 365 A5 for Education licensing optimization
  • Post-migration FERPA compliance validation

Migration Pricing

Fixed-fee pricing with no surprises. Every proposal includes a detailed scope, timeline, and deliverables. All prices are determined after a discovery assessment.

Quick-Start

From $15,000
Under 100 users
2-3 weeks
  • Email and calendar migration
  • OneDrive file migration
  • Basic identity setup
  • DNS cutover
  • Post-migration support (1 week)
Best for: Small organizations with straightforward migration needs
Most Popular

Standard

$35,000 - $75,000
100 - 1,000 users
4-8 weeks
  • Full workload migration (email, files, SharePoint, Teams)
  • Identity and Entra ID configuration
  • SharePoint site migration with permissions
  • Teams channels and data migration
  • User training sessions
  • Hypercare support (2 weeks)
  • Project manager assigned
Best for: Mid-market organizations needing comprehensive migration

Enterprise

From $100,000
1,000 - 10,000+ users
8-24 weeks
  • Everything in Standard, plus:
  • Proprietary migration tool deployment
  • Custom solutions migration (workflows, apps)
  • Compliance validation (HIPAA, SOC 2, FedRAMP)
  • M&A due diligence and Day-1 planning
  • Dedicated migration engineer team
  • Hypercare support (4 weeks)
  • 24/7 support during cutover
  • Executive status reporting
Best for: Large enterprises, regulated industries, M&A transactions

All pricing is indicative. Final proposals are based on a discovery assessment of your specific environment and requirements. Contact us for a custom quote.

Migration Case Studies

Real results from real enterprise migrations. Every case study represents a completed engagement with verified outcomes.

HealthcareHIPAA

Healthcare System M&A

12,000 users
8 weeks
Tenant-to-tenant merger of two hospital networks

Zero downtime, HIPAA compliant, completed 3 weeks ahead of schedule

FinanceSOC 2

Global Financial Services

8,500 users
10 weeks
Google Workspace to Microsoft 365 full migration

100% data integrity, SOC 2 maintained throughout, $2.1M annual savings

GovernmentFedRAMP

Federal Agency Cloud Migration

5,200 users
14 weeks
On-premises Exchange and SharePoint to GCC High

FedRAMP authorized, zero security incidents, full audit trail

FinanceSOC 2

Private Equity Portfolio Consolidation

15,000 (across 6 companies) users
16 weeks
Consolidate 6 tenants into 1 after PE roll-up

6 tenants merged, $4.2M license savings, unified management

EducationFERPA

K-12 Education District

22,000 (staff + students) users
12 weeks
Google Workspace to M365 A5 for Education

FERPA compliant, 99.8% user satisfaction, Copilot enabled

ManufacturingSOC 2

Manufacturing Conglomerate Divestiture

3,800 users
6 weeks
Carve out business unit from parent tenant

Clean separation on Day 1 of divestiture closing, zero data leakage

Why M&A Firms Choose EPC Group

When deal timelines are immovable and integration success determines transaction value, private equity firms and corporate development teams turn to EPC Group.

Due Diligence IT Assessment

During the letter of intent (LOI) phase, EPC Group assesses the target company's Microsoft 365 environment to identify migration risks, hidden costs, and integration complexity. Our assessment report gives deal teams the IT cost projections they need for financial modeling. We have uncovered licensing liabilities, security gaps, and compliance deficiencies that directly impacted deal valuations.

Day-1 Readiness Planning

On the day a deal closes, acquired employees need access to the acquiring company's email, Teams, SharePoint, and corporate applications. EPC Group builds Day-1 readiness plans that include identity federation between tenants, temporary mail flow rules, emergency access to critical applications, and communication templates. Day-1 failures create employee anxiety and productivity loss that set the tone for the entire integration.

Accelerated Tenant Consolidation

M&A deals often have integration milestones tied to earnout provisions or regulatory requirements. EPC Group's proprietary migration tool and dedicated project teams complete tenant consolidations 40-60% faster than standard timelines. For a recent PE roll-up, we consolidated 6 tenants (15,000 users total) into a single tenant in 16 weeks, saving $4.2M in annual licensing costs.

Fixed-Fee Budget Certainty

M&A integration budgets are set during deal negotiation and approved by investment committees. Cost overruns are not an option. EPC Group provides fixed-fee migration proposals with clearly defined scope, timeline, and deliverables. If the migration takes longer than planned due to our execution, we absorb the cost. This model has made us the preferred migration partner for PE firms managing portfolio company integrations.

EPC Group vs. DIY vs. Other Migration Partners

The true cost of migration is not the partner fee. It is the downtime, data loss, compliance gaps, and productivity disruption that result from choosing the wrong approach.

FactorEPC GroupOther PartnersDIY (Internal IT)
Migration Speed40-60% faster (proprietary tool)Standard timelines2-3x longer
Data Loss RiskZero (checksum validated)Low-MediumMedium-High
DowntimeZero downtime guaranteedHours to daysDays to weeks
Compliance HandlingHIPAA, SOC 2, FedRAMP expertiseBasicNone typically
M&A Experience50+ per year1-5 per yearNone typically
Cost CertaintyFixed-fee pricingTime and materialsHidden internal costs
Post-Migration Support2-4 weeks hypercare1 week (if any)Self-supported
Experience Level29 years, 2,000+ migrationsVaries widelyFirst migration often

The Hidden Cost of DIY Migration: Organizations that attempt Microsoft 365 migrations internally report an average of 3-5 days of email downtime, 15-20% data loss in SharePoint migrations, and 6-12 months of productivity disruption from poor adoption. The cost of remediation after a failed DIY migration typically exceeds the cost of hiring an experienced partner from the start.

Related Migration Resources

Microsoft 365 Consulting

Full lifecycle M365 consulting including deployment, governance, and optimization.

Read guide

Exchange to M365 Migration Guide

Complete enterprise guide for migrating on-premises Exchange to Exchange Online.

Read guide

Tenant-to-Tenant Migration Guide

Detailed playbook for M&A tenant consolidations and divestitures.

Read guide

Office 365 Migration Guide

Comprehensive enterprise guide covering all migration scenarios and best practices.

Read guide

Microsoft 365 Migration: Frequently Asked Questions

How long does a Microsoft 365 tenant-to-tenant migration take?

Tenant-to-tenant migration timelines depend on data volume, user count, and complexity. For organizations with 100-500 users: 2-4 weeks. For 500-2,000 users: 4-8 weeks. For 2,000-10,000 users: 8-16 weeks. For 10,000+ users: 3-6 months. EPC Group's proprietary migration tool accelerates timelines by 40-60% compared to native Microsoft tools. Our record is migrating a 15,000-user organization in 6 weeks with zero downtime and zero data loss. Key factors affecting timeline: mailbox sizes, SharePoint data volume, Teams configurations, custom applications, and compliance requirements (HIPAA, SOC 2, FedRAMP add 2-4 weeks for validation).

How much does a Microsoft 365 migration cost?

Microsoft 365 migration costs vary by scope: Quick-Start migrations (under 100 users, basic email and files) start at $15,000. Standard migrations (100-1,000 users, full workload including Teams, SharePoint, and OneDrive) range from $35,000-$75,000. Enterprise migrations (1,000-10,000+ users with compliance requirements, custom integrations, and multi-phase rollout) start at $100,000 and scale based on complexity. Per-user costs typically range from $25-$150 depending on data volume and migration type. EPC Group provides fixed-fee proposals after a discovery assessment, so there are no surprise costs. M&A tenant consolidations are priced separately based on timeline urgency and regulatory requirements.

Can you migrate Google Workspace to Microsoft 365?

Yes. EPC Group has completed 625+ Google Workspace to Microsoft 365 migrations, more than any other Microsoft partner. We migrate: Gmail to Outlook (email, folders, labels, rules), Google Drive to OneDrive and SharePoint (files, permissions, sharing links), Google Calendar to Outlook Calendar (events, recurring meetings, shared calendars), Google Contacts to Exchange contacts, Google Sites to SharePoint, Google Chat and Hangouts history to Teams, and Google Forms to Microsoft Forms. Our proprietary migration tool preserves metadata, timestamps, folder structures, and sharing permissions. We also handle identity migration from Google to Microsoft Entra ID, DNS cutover, and a coexistence period where both platforms run simultaneously.

What happens to email during a Microsoft 365 migration?

With EPC Group's migration methodology, email service is never interrupted. We use a coexistence approach: 1) Mail flow is configured so both the source and destination systems receive email simultaneously. 2) Historical email is migrated in background batches during off-hours, typically processing 50-100 GB per hour. 3) A delta sync captures any new email received during migration. 4) DNS MX records are updated during a maintenance window (typically under 30 minutes of potential delay, not downtime). 5) Post-cutover validation confirms all email is accessible. Users continue sending and receiving email throughout the entire process. Our zero-downtime guarantee means no lost emails, no bounced messages, and no gaps in email history.

What is a tenant-to-tenant migration and when is it needed?

A tenant-to-tenant migration moves all Microsoft 365 data, identities, and configurations from one Microsoft 365 tenant to another. It is required during: mergers and acquisitions (consolidating two companies into one tenant), divestitures and spin-offs (splitting one tenant into two), rebranding (changing the primary domain), and tenant consolidation (combining multiple tenants acquired over time). EPC Group migrates: user mailboxes, OneDrive files, SharePoint sites and permissions, Teams channels and chat history, Planner boards, Power BI workspaces, Power Automate flows, Entra ID users and groups, conditional access policies, and Intune device configurations. Our M&A migration practice handles 50+ tenant consolidations per year.

How do you ensure zero data loss during migration?

EPC Group guarantees zero data loss through a multi-layer verification process: 1) Pre-migration audit catalogs every mailbox, file, site, and team with item counts and sizes. 2) Migration is performed using our proprietary tool with built-in checksum validation for every item transferred. 3) Delta synchronization runs continuously to capture changes made during migration. 4) Post-migration validation compares source and destination item counts, folder structures, and file checksums. 5) User acceptance testing (UAT) period allows end users to verify their data. 6) Source environment is preserved for 30-90 days post-migration as a safety net. In 29 years and thousands of migrations, EPC Group has maintained a 100% zero-data-loss record.

Do you handle migrations for regulated industries (HIPAA, SOC 2, FedRAMP)?

Yes. EPC Group specializes in migrations for regulated industries. For Healthcare (HIPAA): We execute BAA-compliant migrations with PHI encryption in transit and at rest, audit logging of all data movement, and post-migration HIPAA control validation. For Financial Services (SOC 2): Migrations follow SOC 2 Type II controls with chain-of-custody documentation, encryption, and access logging. For Government (FedRAMP): We migrate to GCC, GCC High, and DoD environments with FedRAMP-authorized tools and personnel with appropriate clearances. For Education (FERPA): Student data is migrated with FERPA-compliant handling and access controls. Each regulated migration includes a compliance validation report that serves as evidence for auditors.

What is EPC Group's proprietary migration tool?

EPC Group's proprietary migration tool was developed over 15 years of enterprise migrations and offers capabilities beyond native Microsoft tools or third-party products like ShareGate or BitTitan. Key features: 1) Zero-downtime migration with continuous coexistence, 2) Parallel batch processing migrating 50-100 GB/hour, 3) Automatic metadata preservation (timestamps, permissions, version history), 4) Built-in checksum validation for every item, 5) Real-time dashboard showing migration progress, errors, and completion estimates, 6) Automatic retry with exponential backoff for throttled API calls, 7) Cross-platform support (Google, Exchange, Lotus Notes, GroupWise to M365), 8) Compliance-grade audit logging for regulated industries. The tool has been used in 2,000+ migrations with zero data loss.

How does EPC Group handle SharePoint migration?

SharePoint migration is often the most complex workload. EPC Group's approach: 1) Discovery and assessment: Catalog all sites, libraries, lists, custom solutions, workflows, and InfoPath forms. 2) Architecture planning: Design the target SharePoint Online structure (hub sites, communication sites, team sites). 3) Content migration: Move documents with full version history, metadata, and permissions intact. 4) Custom solutions: Rebuild legacy workflows in Power Automate, convert InfoPath forms to Power Apps, and modernize custom web parts. 5) Permissions mapping: Map on-premises AD groups to Entra ID groups and validate access. 6) Search configuration: Rebuild managed properties, result sources, and search verticals. We handle SharePoint Server 2010, 2013, 2016, and 2019 to SharePoint Online migrations.

Why do M&A firms choose EPC Group for tenant migrations?

M&A firms and private equity groups choose EPC Group because: 1) Speed — our proprietary tool completes migrations 40-60% faster than competitors, critical for M&A timelines. 2) Experience — 50+ M&A tenant consolidations per year across healthcare, finance, and technology sectors. 3) Day-1 readiness — we provide Day-1 IT integration plans so acquired employees have access to corporate systems on closing day. 4) Due diligence support — we assess target company M365 environments during due diligence to identify migration risks and costs. 5) Fixed-fee pricing — M&A deals need budget certainty; our fixed-fee model eliminates cost overruns. 6) Compliance continuity — we ensure regulatory compliance (HIPAA, SOC 2) is maintained throughout the transition with no gaps.

Can you migrate from on-premises Exchange to Microsoft 365?

Yes. EPC Group has migrated hundreds of organizations from on-premises Exchange (2010, 2013, 2016, 2019) to Exchange Online in Microsoft 365. Our approach: 1) Hybrid configuration: Set up Exchange hybrid to enable coexistence during migration. 2) Staged mailbox moves: Migrate mailboxes in batches during off-hours, starting with pilot users. 3) Public folder migration: Convert public folders to shared mailboxes or Microsoft 365 Groups. 4) Distribution list migration: Migrate distribution lists and convert to Microsoft 365 Groups where appropriate. 5) Archive migration: Move online archives and retain litigation holds. 6) Decommission: Remove on-premises Exchange servers after validation. Typical timeline: 4-12 weeks depending on user count and data volume. We maintain mail flow throughout with zero interruption.

What does EPC Group's migration methodology look like?

EPC Group follows a proven 6-phase migration methodology: Phase 1 — Discovery & Assessment (1-2 weeks): Inventory source environment, identify risks, define success criteria. Phase 2 — Architecture & Planning (1-2 weeks): Design target environment, create migration runbook, establish rollback plan. Phase 3 — Pilot Migration (1-2 weeks): Migrate 25-50 pilot users, validate all workloads, refine process. Phase 4 — Batch Migration (2-12 weeks): Execute migration in planned batches with continuous monitoring. Phase 5 — Cutover & Validation (1 week): DNS updates, final delta sync, post-migration validation, UAT. Phase 6 — Hypercare & Optimization (2-4 weeks): Dedicated support team, issue resolution, training, and documentation. Every migration includes a dedicated project manager, migration engineer, and 24/7 support during cutover.

Ready to Migrate to Microsoft 365?