The direct answer
Microsoft Lists is the app; SharePoint lists are the lists inside sites; Microsoft states that both run on the same lists platform. The governance question is not which one to use but where each list is saved. A list in a SharePoint site belongs to that site, its owners and its sharing settings. A list in My lists sits in the creator's personal storage and follows their OneDrive sharing permissions. Most enterprises decide that shared business data lives in sites, and set the tenant controls to match.
One platform, three places a list can live
| Saved to | Permissions | Sharing follows | In Microsoft Teams |
|---|---|---|---|
| A SharePoint site | Inherited from the site by default | The site's sharing settings, set by administrators | Can be added to a channel as a tab with Add an existing list |
| A team, from the Lists app in Teams | Inherited from the team's SharePoint site | The team site's sharing settings | Created as a channel tab; saved in the team's site |
| My lists | The creator | The owner's OneDrive sharing permissions | Cannot be added with Add an existing list, which accepts only lists stored in SharePoint |
Sources: Microsoft Learn, Manage the Lists app in Microsoft Teams; Microsoft Support, Get started with lists in Teams and Share a list or list item (accessed 2026-11-07). Teams on mobile cannot create or pin lists yet, guests cannot create or delete lists, and administrators allow or block the Lists app in the Teams admin center under Teams apps, Manage apps (Microsoft Learn, accessed 2026-11-07).
What works the same in Microsoft Lists and SharePoint lists
- Templates. Microsoft Support names templates such as Issue tracker, Asset manager, Content scheduler, Employee onboarding, Event itinerary, Recruitment tracker and Travel requests; Microsoft Learn lists 18 template IDs administrators can switch off one by one.
- Rules. Set under Integrate, Rules, with triggers such as an item being modified; they notify people or a person column, not a group email address, and need Contribute permission.
- Views. List, Calendar and Gallery views, with List, Compact list or Tiles layouts; board view supports drag-and-drop reordering.
- Comments. Visible to anyone with access to the list unless an administrator turns them off; guests can read but not add them.
- Automation and audit. Power Automate flows and Power Apps list forms work on both, and list and item events appear in the Microsoft Purview audit log.
The governance controls that matter
- Personal lists.
Set-SPOTenant -DisablePersonalListCreation $trueremoves My lists from the save options, so users must choose a site;$falseturns it back on (Microsoft Learn, Control settings for Microsoft Lists, accessed 2026-11-07). - Templates.
Set-SPOTenant -DisableModernListTemplateIdsremoves a built-in template from the Lists app, Teams and SharePoint;EnableModernListTemplateIdsrestores it. - Comments.
Set-SPOTenant -CommentsOnListItemsDisabledturns commenting on list items off or on. - Sharing. Only administrators set a site's external sharing, within the organization's limit; sharing a list needs manage permissions, which only site and list owners have by default (Microsoft Learn; Microsoft Support, accessed 2026-11-07).
- Retention. Retention policies do not cover list items; retention labels do, except on system lists (Microsoft Learn, accessed 2026-11-07). Apply labels on lists that hold records.
- Sensitivity labels. Labels protect the container (the team, group or site): privacy, external sharing and unmanaged-device access. Items do not inherit the container label (Microsoft Learn, accessed 2026-11-07).
Limits that shape list design
A list can hold up to 30 million items, but the list view threshold of about 5,000 items per database operation cannot be changed in SharePoint in Microsoft 365, so large lists need indexed columns (up to 20 per list) and filtered views. Microsoft supports 50,000 unique permissions per list and recommends no more than 5,000, and lists keep major versions only, 500 by default (Microsoft Learn, SharePoint limits; Microsoft Support, Manage large lists and libraries; How versioning works in lists and libraries, accessed 2026-11-07).
Changes to plan for
SharePoint alerts stop working by July 2026; Microsoft's pages differ on when new alert creation ended for every tenant (September 2025 in the SharePoint service description, January 2026 on the support retirement page), and both point to rules or Power Automate. SharePoint 2013 workflows were retired on April 2, 2026 with no extension (Microsoft Support, accessed 2026-11-07). Microsoft's InfoPath page states that support for InfoPath 2013 ended on July 14, 2026 and advises moving forms to supported Microsoft 365 solutions, which for list forms means Power Apps. See rebuilding workflows in Power Automate.
Where EPC Group helps
EPC Group writes the list governance standard with the client: where business lists live, which templates stay on, naming, retention labels for lists that hold records, and the move from alerts to rules and from InfoPath list forms to Power Apps. For the build steps see how to create a SharePoint site, list and document library; for list architecture at scale see the SharePoint lists enterprise guide.
Primary sources
- SharePoint limits — Microsoft Learn, accessed 2026-11-07
- Microsoft 365 suite features (Microsoft Lists) — Microsoft Learn, accessed 2026-11-07
- Manage the Lists app in Microsoft Teams — Microsoft Learn, accessed 2026-11-07
- Get started with lists in Teams — Microsoft Support, accessed 2026-11-07
- Control settings for Microsoft Lists — Microsoft Learn, accessed 2026-11-07
- Share a list or list item — Microsoft Support, accessed 2026-11-07
- Change the sharing settings for a site — Microsoft Learn, accessed 2026-11-07
- Learn about retention for SharePoint and OneDrive — Microsoft Learn, accessed 2026-11-07
- Use sensitivity labels to protect content in Teams, groups and sites — Microsoft Learn, accessed 2026-11-07
- Create a rule to automate a list or library — Microsoft Support, accessed 2026-11-07
- SharePoint alerts retirement — Microsoft Support, accessed 2026-11-07
- SharePoint 2013 workflow retirement — Microsoft Support, accessed 2026-11-07
Frequently Asked Questions
Is Microsoft Lists different from a SharePoint list?
Not underneath. Microsoft states that Microsoft Lists and SharePoint lists run on the same lists platform; Microsoft Lists is the Microsoft 365 app for tracking information with views, rules and templates, on the web, on mobile and in Teams (Microsoft Learn, accessed 2026-11-07). What differs is where a list is saved, and EPC Group governs that choice.
Can we stop users from creating personal lists?
Yes. Set-SPOTenant -DisablePersonalListCreation $true removes My lists from the Save to choices, so every new list goes to a SharePoint site, and Set-SPOTenant -DisableModernListTemplateIds removes individual built-in templates from the Lists app, Teams and SharePoint (Microsoft Learn, Control settings for Microsoft Lists, accessed 2026-11-07).
How are lists shared outside the organization?
Sharing a list needs manage permissions, which only site or list owners have by default, and the link types offered are capped by the sharing settings an administrator sets for the site; lists saved to My lists follow the owner's OneDrive sharing permissions (Microsoft Support; Microsoft Learn, accessed 2026-11-07).
Do retention policies cover list items?
Microsoft states that retention policies do not cover list items but retention labels do, except on system lists, and that retention does not apply to a list as a container (Microsoft Learn, Learn about retention for SharePoint and OneDrive, accessed 2026-11-07). EPC Group applies retention labels to lists that hold records.
What replaces SharePoint alerts on lists?
Rules and Power Automate. Microsoft retires SharePoint alerts in July 2026, and its pages differ on when new alert creation ended for every tenant (September 2025 in the service description, January 2026 on the support page). Rules are set under Integrate, Rules, notify people or a person column, and need Contribute permission (Microsoft Support, accessed 2026-11-07).
Talk to a senior architect
A one-hour call with a senior EPC Group architect covers where your business lists should live, which tenant controls to set, and how alerts and InfoPath forms move to rules, Power Automate and Power Apps. Email contact@epcgroup.net or call 888-381-9725.
Documented and anonymized engagements
Named engagements come first; anonymized summaries follow under the anonymized-engagement rule — the client is not named and every statement is EPC-reported. Documents behind named engagements are in the Evidence Center.
- Samsung Semiconductor, Inc. — SharePoint Server 2019 build and deployment: custom user experience, navigation, web parts, search, enterprise-application integration, quality assurance and training (2021)Samsung Semiconductor, Inc. · 2021 · Contracted — countersigned
- Canadian Forces Morale & Welfare Services (CFMWS) — SharePoint consulting support (2014)Canadian Forces Morale & Welfare Services (CFMWS) · 2014 · Contracted
- Stryker Corporation — SharePoint Center of Excellence development (2012)Stryker Corporation · 2012 · Delivered — payment-corroborated (client payment records published)
- Federal Reserve Bank of New York — SharePoint best-practices needs assessment, architecture and governance gap analysis, roadmap for a global SharePoint Center of Excellence across the twelve Reserve Bank districts (2010)Federal Reserve Bank of New York · 2010 · Contracted — countersigned, with historical work product
- Copilot and SharePoint AI Governance: Regional Bank (2024)Anonymized engagement summary · Regional bank · 2024Engagement phase: governance and readiness planning before a Copilot rollout; no rollout is reported
- SharePoint Intranet Permission Automation: Contractor (2024)Anonymized engagement summary · Federal government contractor · 2024
- Two SharePoint Farms to SharePoint Online: Regional BankAnonymized engagement summary · Regional bank · 2024
- SharePoint Health Check, Upgrade and Support: ManufacturerAnonymized engagement summary · Consumer-products manufacturer · 2017–2023
More engagements: NASA (agency-wide, across the NASA Centers) — Agency SharePoint Phase 1 Initiative: needs assessment, architectural review, governance, and a global SharePoint Center of Excellence for knowledge management, intranet and enterprise content management across the NASA Centers (2009–2010) · National Archives and Records Administration (NARA) — SharePoint records management and Center of Excellence advisory and implementation support (2010) · National Institutes of Health — SharePoint Center of Excellence design (2010) · Northrop Grumman — 'Finance I.R.M. Automation Process' statement of work on SharePoint (2010) · NASA Johnson Space Center — SharePoint Site Provisioning Solution (2009) · YMCA (Houston) — Microsoft Office SharePoint Server 2007 implementation (2007) · SharePoint Support and Custom Apps: Professional Services · SharePoint 2010 to 2019 Migration: Regional Bank (2020) · SharePoint Online Document Management: Transportation (2020) · SharePoint 2010 to Online Design: Global Law Firm (2018) · SharePoint 2016 Intranet Redesign: Energy Company (2018) · SharePoint Intranet Redesign: Financial Services · SharePoint Migration: Major Healthcare Network
